20ft Lunch Room Container for Sale | SCS Australia

Buy Now & Pay Later Options Available - Learn More

The basics

A Site Office Built for Breaks

The 20ft lunch room is our 20ft site office built for meal breaks, part of our lunch room containers : the same shell, lining, wiring and cooling as the office, with two changes. A plumbed kitchenette is fitted, and the split system is mounted high on the end wall instead of low. The floor seats up to nine, and the unit still lifts and travels as a standard 20ft container.

White 20ft lunch room container on a construction site, with a steel door between two mesh-guarded windows

Sizes and specs

Lunch Room Specifications

The 20ft lunch room is 6,058 × 2,438 × 2,896 mm outside, about 12 m² inside, and seats up to nine. Entry-level builds sit on a 2,591 mm general purpose shell, and both heights keep the ISO 668 20ft footprint. The plate carries a 10,000 kg maximum gross weight. Tare is typically 2,500 kg: the 20ft site office’s plated 2,300 kg plus about 200 kg for the kitchenette, sink and hot water. That leaves a typical payload of 7,500 kg. Weights are typical and are confirmed for each build when we quote.

Technical specifications
Specification Value
Outside, high cube (length × width × height) 6,058 × 2,438 × 2,896 mm
Outside, general purpose 6,058 × 2,438 × 2,591 mm, entry-level builds
Inside (typical, as lined) 5,770 × 2,150 × 2,440 mm
Floor area About 12 m²
Seating Up to 9 people
Tare weight 2,500 kg (typical)
Maximum gross weight, plated 10,000 kg
Payload 7,500 kg (typical)
Shell New 20ft high cube built for the purpose, 2 mm Corten steel walls in SCS's pressed trapezoidal-rib profile, shot-blasted and three-coat painted on top-level builds, one-trip or cargo worthy shells at entry level
Walls and ceiling 50 mm machine-made panels, rock wool core, colour-coated steel faces in RAL 9010 white
Floor 20 mm cement fibre board under 2 mm vinyl coved 100 mm up the walls (150 mm on mine-spec builds), timber or plywood at the budget level
Switchboard 15-way flush-mounted board, 63 A main breaker, 10 A lighting and 20 A power circuits, RCD safety switches, 40 kA surge protection
Lighting and power 10 W LED downlights switchable between warm and cool white, GPO outlets, internal and external lighting, weatherproof external switch
Cabling 6 mm² and 2.5 mm² TPS cable in PVC conduit, stainless steel saddle clips
Air conditioning Midea reverse-cycle split system to Australian Standards
Air conditioner position Mounted high on the end wall, outdoor unit set into the wall within the 20ft footprint
Kitchenette Sink with hot and cold water, stainless steel benchtop, space and power for a microwave and fridge
Plumbing connection Plumbed before dispatch to AS/NZS 3500, standard hose inlet and grey water outlet
Smoke alarm Hard-wired, with battery backup
Door Lockable fire-rated steel door with lockbox
Windows Sliding aluminium, double glazed to AS/NZS with a 9 mm argon gap, flyscreens, plus security bars and mesh or lockable shutters
Seals and fixings EPDM seals, neutral-cure silicone and PU foam at joints and penetrations, galvanised fixings
Phone and data Cabling provision for phone and data
Tables and benches Not included as standard, arranged at order
Build time Typically 4 to 6 weeks once the design is final and the quote accepted, delivery and installation generally 1 to 2 days
Warranty 12-month limited warranty from delivery, in addition to Australian Consumer Law rights, component manufacturer warranties passed on
Kitchenette inside a 20ft lunch room container: sink, benchtop and cupboards, with the split system mounted high on the end wall

Kitchenette

The Kitchenette

Every unit has a sink with hot and cold water, a stainless steel benchtop, and space and power for a microwave and fridge. The appliances are provided for, not supplied, so the crew or the site supplies them. SCS plumbs the sink and hot water to AS/NZS 3500 in the factory, so the 20ft kitchenette container arrives ready to connect, and the kitchenette GPOs run off the same RCD-protected board as the lights. On site, the shipping container lunch room needs only a standard hose connection to its water inlet and a place for the grey water outlet to drain.

Inside a 20ft lunch room container looking toward the door: LED downlights, lined walls and a coved vinyl floor

Cooling

Air Conditioning Mounted High

The split system sits high on the end wall so benches and the kitchenette can run the full length below it. On the 20ft site office the same Midea reverse-cycle unit sits low. The outdoor unit is set into the wall within the 20ft footprint, so nothing projects past the corner castings. A fitted 20ft crib room therefore still lifts, stacks and travels as a standard 20ft container, with no oversize permit and no unit to remove before a move.

Compliance

Standards for Australian Sites

The shell follows ISO 668 and carries a CSC plate. The fit-out follows the NCC, AS/NZS 3000 and AS/NZS 3500. The CSC safety plate covers transport and is confirmed for each build at quote. Fit-out materials satisfy the current NCC wherever a site classes the unit as a building, with the wiring and kitchenette GPOs to AS/NZS 3000. AS/NZS 3500 applies to every lunch room, because the kitchenette is standard. Units for Region D cyclonic areas come with AS/NZS 1170 wind-load engineering and tie-down documents, and mine-spec builds add smoke alarms, exit lighting and illuminated signs, with engineering documentation for site audits.

ISO certification ISO
Bureau Veritas certification Bureau Veritas
DNV certification DNV
Lloyd's Register certification Lloyd's Register
Bureau International des Containers (BIC) certification BIC
American Bureau of Shipping (ABS) certification ABS

Customisation

Options Chosen at Order

Every lunch room container for sale in the range has its options fitted in the factory before dispatch.

Tables and Benches

Not standard, arranged at order to seat up to nine.

Shelving and Partitions

Shelves for crib boxes and PPE, or a partition for storage.

Roof Vents

Solar or whirlybird vents that move air while the split system is off.

Stairs and Ramps

Stairs or a ramp to the door when the unit sits on raised pads.

Paint and Branding

Exterior paint in company colours, branding applied at the factory.

Phone and Data

Cabling installed before the unit leaves the factory.

Hoarding Platform

An optional 10 kPa hoarding platform, rated for Australian sites.

FAQ

20ft Lunch Room Questions

Common questions about the 20ft lunch room.

How many people fit in a 20ft lunch room?

Up to nine, across about 12 m² of floor. Tables and benches are not standard, so we arrange them at order to suit your crew and the space beside the kitchenette.

Are the fridge and microwave included?

The kitchenette has the space and power points for a microwave and a fridge, plus a sink with hot and cold water and a stainless steel benchtop. The appliances themselves are not supplied.

Does a lunch room need plumbing on site?

It needs a standard hose connection for water and somewhere for the grey water outlet to drain, plus a level pad and a power supply. The kitchenette is plumbed to AS/NZS 3500 in the factory.

How is it different from the 20ft site office?

Two changes: a plumbed kitchenette is fitted, and the split system is mounted high on the end wall instead of low. The shell, panels, wiring, door and windows are identical.

How long does it take, and what warranty applies?

Builds typically take 4 to 6 weeks once the design is final, and delivery and installation generally 1 to 2 days. A 12-month limited warranty from delivery applies, on top of Australian Consumer Law rights, with component manufacturer warranties passed on.

Get a Delivered Price on a 20ft Lunch Room

Tell us your crew size, options and delivery address, and we send back a priced build with drawings.