How to Get Approval for Your Relocatable Home in NSW

Summary

Get council approval for your relocatable home in NSW. SCSAU's guide to DA, Section 68, and compliance requirements. Start building today.

This article sits alongside our Transportable Granny Flats range.

01

How to Get Approval for Your Relocatable Home in NSW

Building or placing a relocatable home in New South Wales? Understanding the approval process is vital. This guide outlines the essential steps—from council applications to compliance—so you can navigate approvals smoothly and confidently in NSW.

02

Prepare Your Application Documentation

For both DA and Section 68 applications, gather:

  • Structural engineer’s certificate, compliant with NSW regulations
  • Site plans showing setbacks, site coverage, and access
  • Compliance plate details, wind-speed rating, and manufacturer info

These documents prove your relocatable home meets safety, building code, and siting standards.

6m x 6m Portable Building Insitu Front

03

Know the Approval Pathways

In NSW, relocatable homes are classified as manufactured or moveable dwellings—not traditional buildings.

You’ll likely need a Development Application (DA) and a Section 68 approval under the Local Government Act 1993. These approvals assess land use, structural integrity, and sewage management.

04

When Can You Skip DA?

Temporary placement (e.g., up to 60 days in any year) may not trigger DA consent under state moveable-dwelling provisions.

However, for longer installation or permanent use on private land, a formal Development Application is required.

05

Lodge Your Application

Use the NSW Planning Portal to apply:

  • Choose ‘Section 68’ for relocatable home classification
  • Provide all applicant details, owner consent, structural plans, and site diagram
  • Pay the applicable council fees online or in person

Once processed, your council issues approval and you can proceed.

06

Installation & Tie‑Down Compliance

Install the home per engineering standards:

  • Use the specified footings or tie-down systems
  • Maintain under‑floor clearance and wind-load compliance
  • Attach the compliance plate visibly on the unit after installation

This ensures your home is storm‑safe and structurally compliant.

07

Post-Installation Notice of Completion

After installation, submit a ‘Notice of Completion’ to your council within 7 days:

Include:

  • Final site certificate
  • Structural engineer’s certificate
  • Compliance plate details and site layout confirmation

This document fulfils legal obligations and confirms your installation is complete.

08

Common Pitfalls to Avoid

  • Starting installation without approvals can lead to refusal or compliance orders.
  • Missing structural certification or site planning documents causes delays.
  • Incorrect classification—like treating relocatable homes as permanent builds—can lead to unnecessary CDC requirements
09

Summary of Steps

StepTask
1Confirm if DA + Section 68 required
2Obtain engineer’s certificate & compliance plate
3Submit application via NSW Planning Portal
4Install per certified plan
5Lodge Notice of Completion
6Keep documentation for future reference

Shop the Range of Portable Buildings

FAQ

Frequently Asked Questions –Approval for Relocatable Home NSW

Q. Do I need council approval for a relocatable home in NSW?

A. Yes. Most installations beyond short-term placement require a Development Application and Section 68 approval under the Local Government Act 1993.

Q. What documents are needed for approval?

A. A structural engineer’s certificate, site plan with setbacks, and a compliance plate showing wind load and manufacturer details are required.

Q. How do I apply online?

A. Use the NSW Planning Portal, choose Section 68 application, upload documents, owner consent, and pay fees electronically.

Q. Can I install before getting approval?

A. No. Installation before approvals may lead to refusal, fines, or legal issues. Always lodge first and install after approval is granted.

Q. What happens after installation?

A. Submit a ‘Notice of Completion’ within 7 days to council, with engineer’s certificate and compliance plate information to finalise the process.

Q. What if my relocatable home is larger than one storey or on flood-prone land?

A. You’ll require additional documentation. Multi-storey units or homes on flood-affected land need specific application forms and assessments.